Testing and pre-commissioning are crucial stages, involving various tests to verify the transformer's integrity and functionality. Any issues identified during testing are addressed before commissioning. During commissioning, the transformer is energized and integrated into the electrical system, with performance monitored to ensure compliance with specifications. Detailed documentation is maintained throughout the process, including records of installation, test results, and operating manuals, essential for future reference and maintenance. Overall, the process demands careful planning, skilled labor, adherence to safety standards, and thorough testing to ensure the reliable and safe operation of the transformer.